← Anaheim charger install cost · Landlord hub
EV charging for rentals and condos in Anaheim, CA
Short answer: A single Level 2 install costs $749–$2,500 nationally (Qmerit), or $149–$1,900 after the verified local rebate. Anaheim permit: Level 2 EV charger: “The cost of the building permit is $172” (electrical permit). Law: California has a right-to-charge law covering renters and condo/HOA owners. Rent: no measured premium found; in one 2022 survey renters said they would be willing to pay $28.12/month more (stated willingness, not achieved rent).
Last updated:
Install cost per space
| Level 2 install (national) | $749–$2,500 (typical standard install about $1,700); a panel upgrade adds $1,500–$3,000 Source: Qmerit – How much does Level 2 EV charger installation cost? (national) (accessed 2026-10-25). |
|---|---|
| Anaheim permit | Level 2 EV charger: “The cost of the building permit is $172” (electrical permit) (EV-specific · official schedule) EV-specific fee from the official city/county fee schedule (accessed 2026-10-25). Surcharges and other fees may apply; confirm with the city. Source: City of Anaheim – Electric Vehicle Charger (official) (accessed 2026-10-25). |
| Net of verified rebate | $149–$1,900 Math: $749 − $600 = $149; $2,500 − $600 = $1,900 Source: Anaheim Public Utilities program page (official) (accessed 2026-10-25). |
These are single-family style installs. Multi-unit garages often need load management, trenching or service upgrades; site-specific cost data for Anaheim is pending.
California right-to-charge rules
| Condo / HOA owners (California) | Civil Code §4745: governing-document terms that prohibit or unreasonably restrict an EV charger in an owner's designated space are void; an application not denied in writing within 60 days is deemed approved. [read on official page] Source: California Civil Code §4745 – California Legislative Information (accessed 2026-10-25). |
|---|---|
| Renters (California) | Civil Code §1947.6: for leases executed, extended or renewed on or after July 1, 2015, the landlord must approve a compliant written request. Exemptions include properties with chargers in at least 10% of spaces, no parking, fewer than 5 spaces, or certain rent-controlled units. Source: California Civil Code §1947.6 – California Legislative Information (accessed 2026-10-25). |
Summaries, not legal advice. Read the statute before relying on it.
Does a charger raise rent? (survey of stated willingness only)
Stated willingness to pay, not a measured rent premium: the 2022 NMHC/Grace Hill Renter Preferences Report found 27% of renters were interested in EV charging stations and respondents said they would pay an additional $28.12 per month for the amenity.
This is a survey answer from the 2022 report (paywalled; figures quoted by trade press). It is national, not city-specific, and is not evidence that a given unit will rent for $28.12 more. We found no peer-reviewed study measuring achieved rent premiums for EV charging. Sources: Multi-Housing News – EV Charging Basics for Multifamily Owners (Sept 2, 2022), quoting the 2022 NMHC/Grace Hill Renter Preferences Report; Utility Dive – Demand soars for EV charging at multifamily properties (Dec 15, 2022) (accessed 2026-10-25).
No measured rent data for Anaheim: data pending.
Anaheim charging cost · Total cost to drive electric in Anaheim · Condo and HOA rules
Last updated: Oct 25, 2026.
Can my landlord in Anaheim refuse an EV charger?
Civil Code §1947.6: for leases executed, extended or renewed on or after July 1, 2015, the landlord must approve a compliant written request. Exemptions include properties with chargers in at least 10% of spaces, no parking, fewer than 5 spaces, or certain rent-controlled units.
Can a Anaheim condo association ban chargers?
Civil Code §4745: governing-document terms that prohibit or unreasonably restrict an EV charger in an owner's designated space are void; an application not denied in writing within 60 days is deemed approved.
Do EV chargers raise rents?
No measured rent premium found. The 2022 NMHC/Grace Hill survey reports renters say they'd pay $28.12 more per month; that's stated willingness, not achieved rent.
How much does a Level 2 install cost in Anaheim?
$749–$2,500 nationally (Qmerit); permit: Level 2 EV charger: “The cost of the building permit is $172” (electrical permit).