Short answer: A whole-home air-source heat pump for a 1,500–2,500 sq ft home costs about $17,000–$23,000 installed (national median $19,500, Rewiring America); we found no Baltimore-specific price, and the federal 25C heat pump tax credit ended for systems placed in service after Dec. 31, 2025.
Last updated:
How much does a heat pump cost to install?
| System | Installed cost (national, not Baltimore-specific) |
|---|---|
| Whole-home air-source, 1,500–2,500 sq ft | $17,000–$23,000 (median $19,500) |
| Single-zone mini-split | $5,400–$8,500 (median $6,600) |
Source: Whole-home air-source heat pump, 1,500–2,500 sq ft home: $17,000–$23,000 (median $19,500). Single-zone mini-split: $5,400–$8,500 (median $6,600). Ranges are 20th–80th percentile modeled national project costs (equipment plus installation). Rewiring America – Heat pumps: an overview (cost estimates) (accessed 2026-10-25). If your panel needs an upgrade, add that cost (below).
What permit fees apply in Baltimore?
| Electrical permit we found (General electrical permit · official schedule) | New branch circuits: $6 per circuit; minimum fee $25; plus nonrefundable application fee of $25 (1- and 2-family, no plan review). Service 100–200A: $30. Baltimore Building Code §109 (official code) General electrical permit fee from the official city/county fee schedule (accessed 2026-10-25); the schedule has no EV-charger line. Your actual permit may cost more or less. This is the fee for EV charger/electrical work; a heat pump also usually needs a mechanical permit, which we have not sourced (data pending). |
|---|---|
| Service/panel upgrade permit | Service 100–200A: $30, plus $25 nonrefundable application fee. Math: $30 + $25 = $55Baltimore Building Code §109 (official code) (official schedule, accessed 2026-10-25) |
Will I need a panel upgrade?
Possibly, especially if you add a heat pump and an EV charger. National ranges:
| Source | Panel upgrade cost |
|---|---|
| Qmerit (national) | A panel upgrade adds $1,500–$3,000 to a Level 2 charger install. |
| HomeAdvisor (an Angi brand, national) | Panel replacement $518–$2,194 (average $1,347); 200A upgrade $1,300–$2,000; 100A→200A $750–$2,000 excluding new circuits; permits and drywall add $150–$300. Page dated “Updated Jun 17, 2026”. |
Accessed 2026-10-25. Baltimore panel upgrade details.
What rebates are available in Baltimore?
| State HEEHRA/HOMES rebates (MD) | Not verified on an official state page. Check your state energy office. DOE says the rebates “are now available in select states” and tells households to contact their State or Territory Energy Office; its page currently has no state-by-state status map.U.S. DOE – Home Energy Rebates Program (HOMES and HEEHR) (accessed 2026-10-25). |
|---|---|
| Utility panel rebate (EV program) | Data pending: no utility rebate naming panel upgrades found. |
| Utility heat pump rebate | Data pending: we have not yet verified Baltimore utility heat pump rebates. |
| Federal 25C tax credit | Ended. The federal Energy Efficient Home Improvement Credit (section 25C, which covered heat pumps) is not allowed for any property placed in service after December 31, 2025. IRS FS-2025-05 (accessed 2026-10-25) |
How much does a heat pump cost in Baltimore?
We have no Baltimore-specific figure. Nationally, Rewiring America models $17,000–$23,000 (median $19,500) for a whole-home air-source heat pump in a 1,500–2,500 sq ft home and $5,400–$8,500 (median $6,600) for a single-zone mini-split.
Can I still get the federal heat pump tax credit?
No. The federal Energy Efficient Home Improvement Credit (section 25C, which covered heat pumps) is not allowed for any property placed in service after December 31, 2025.
Are HEEHRA/HOMES rebates available in MD?
Not verified on an official MD page. Check your state energy office; DOE says the rebates are available only in select states.
Do I need a permit for a heat pump in Baltimore?
Usually yes: heat pumps typically need mechanical and electrical permits. We have not sourced a Baltimore heat-pump permit fee; the electrical permit we found is: New branch circuits: $6 per circuit; minimum fee $25; plus nonrefundable application fee of $25 (1- and 2-family, no plan review). Service 100–200A: $30.