Panel upgrade cost for an EV charger in Boston, MA

Short answer: A panel upgrade for an EV charger in Boston adds about $1,500–$3,000 (Qmerit, national; no Boston-specific price found).The Boston service-upgrade permit: New/upgraded service: $20 plus $0.25 per amp up to 240V.

Last updated:

National cost range (not Boston-specific)

These are national figures. No Boston-specific panel upgrade price from a primary source was found.

Boston service-upgrade permit fee

New/upgraded service: $20 plus $0.25 per amp up to 240V.
Math: 200A example: $20 + 200 × $0.25 = $70 Source: City of Boston – Electrical permit (official) (official schedule, accessed 2026-10-25).

Utility panel-upgrade rebates

Eversource (Massachusetts): Single household: up to $700 toward wiring/panel on the standard rate; up to $1,000 in environmental-justice communities; up to $1,700 incl. charger on the Discount Rate. Source: Eversource – EV home charging rebates (MA) (accessed 2026-10-25).

Does Angi publish panel-upgrade lead data?

Angi's official help center says each project request is matched with no more than five pros and pros are charged per lead; it publishes no panel-upgrade lead price. A third-party electrician guide reports panel-upgrade/service-change leads at $50–$100+ each (secondary, unverified). Angi's own panel cost article URL we tried returned 404; HomeAdvisor (Angi) is used instead. Angi Help Center – Opportunities and Leads FAQ. Grow Your Trade – Angi Leads for Electricians (secondary, unverified).

Boston home charging cost and time-of-use rate · Before you buy an EV: all 50 cities

How much does a panel upgrade cost in Boston?

No Boston-specific price found. Nationally: Qmerit (national): A panel upgrade adds $1,500–$3,000 to a Level 2 charger install. HomeAdvisor (an Angi brand, national): Panel replacement $518–$2,194 (average $1,347); 200A upgrade $1,300–$2,000; 100A→200A $750–$2,000 excluding new circuits; permits and drywall add $150–$300. Page dated “Updated Jun 17, 2026”.

What is the Boston permit fee for a service upgrade?

New/upgraded service: $20 plus $0.25 per amp up to 240V. Math: 200A example: $20 + 200 × $0.25 = $70

Is there a rebate for a panel upgrade in Boston?

Eversource (Massachusetts): Single household: up to $700 toward wiring/panel on the standard rate; up to $1,000 in environmental-justice communities; up to $1,700 incl. charger on the Discount Rate.

Is there a federal tax credit for an EV charger or panel?

The federal EV charger credit (section 30C) is not allowed for any property placed in service after June 30, 2026.

Last updated: Oct 25, 2026. Methodology