Used EV in Denver, CO: cost to add home charging
Short answer: Level 1 can cost $0 if you have a 120 V outlet and the car's cord set (about 5 miles of range per hour, DOE). A Level 2 install runs $749–$2,500 nationally (Qmerit); Denver permit: Valuation-based: $1–$500 → $20; $501–$2,000 → $35; $2,001–$25,000 → $35 for the first $2,000 plus $8 per additional $1,000 or fraction. No plan review fee at or below $2,000.. Charging costs about $406/yr a year at CO average prices.
Last updated:
Level 1 or Level 2?
| Level 1 (120 V) | Level 2 (240 V) | |
|---|---|---|
| Range added per hour | About 5 miles | About 25 miles |
| Equipment | $0–$900 (often included with the car) | $380–$690 charger |
| Installed cost | $0 if an outlet exists | $749–$2,500 (Qmerit, national) |
Sources: U.S. DOE Alternative Fuels Data Center – Developing Infrastructure to Charge Electric Vehicles; U.S. DOE AFDC – Procurement and Installation for EV Charging Infrastructure; Qmerit – How much does Level 2 EV charger installation cost? (national) (all accessed 2026-10-25).
Used EVs usually come with a Level 1 cord set, but check it is included. DOE: "Most EVs will come with a portable Level 1 cordset."
Denver costs
| Install (national) | $749–$2,500 (typical standard install about $1,700); a panel upgrade adds $1,500–$3,000 Source: Qmerit – How much does Level 2 EV charger installation cost? (national) (accessed 2026-10-25). |
|---|---|
| Permit | Valuation-based: $1–$500 → $20; $501–$2,000 → $35; $2,001–$25,000 → $35 for the first $2,000 plus $8 per additional $1,000 or fraction. No plan review fee at or below $2,000. (General electrical permit · official schedule) General electrical permit fee from the official city/county fee schedule (accessed 2026-10-25); the schedule has no EV-charger line. Your actual permit may cost more or less. Source: Denver Development Fees (official) (accessed 2026-10-25). |
| Utility rebate | Xcel Energy charger wiring rebate: up to $500 (income-qualified $2,300; disproportionately impacted communities $800). You must enroll in Optimize Your Charge. Source: Xcel Energy – Charger wiring rebate. All CO rebates |
| Yearly charging | 2,363 kWh × 17.17¢/kWh = $406/yr Sources: U.S. DOE Vehicle Technologies Office, Fact of the Week #1307 (Sept 11, 2023), citing EIA 2020 RECS; EIA Electric Power Monthly, Table 5.6.A (residential, August 2026, preliminary; released Oct 23, 2026) (accessed 2026-10-25). |
| Used EV tax credit (25E) | Ended for vehicles acquired after September 30, 2025. Source: IRS – FS-2025-05 (Aug. 21, 2025): FAQs for modification of sections 25C, 25D, 25E, 30C, 30D, 45L, 45W and 179D under Public Law 119-21 (OBBB) (accessed 2026-10-25). |
Panel upgrade in Denver · Charging cost and TOU rates · Federal credits that ended
Last updated: Oct 25, 2026.
How much does it cost to add EV charging at home in Denver?
Level 1: $0 if you have an outlet. Level 2: $749–$2,500 nationally (Qmerit); Denver permit: Valuation-based: $1–$500 → $20; $501–$2,000 → $35; $2,001–$25,000 → $35 for the first $2,000 plus $8 per additional $1,000 or fraction. No plan review fee at or below $2,000..
Is Level 1 enough for a used EV?
DOE says Level 1 adds about 5 miles of range per hour, and 8 hours can replenish about 40 miles for a mid-size EV.
Is there a used EV tax credit?
No. The 25E credit ended for vehicles acquired after September 30, 2025 (IRS FS-2025-05).