ChargerCostByCity

← Portland charger install cost

Before you buy an EV: home charging cost in Portland, OR

Short answer: Charging a typical EV at home in Portland costs about $376/yr at the OR average residential price of 15.92¢/kWh (2,363 kWh × 15.92¢/kWh = $376/yr). On Portland General Electric's Time of Day off-peak rate it is $211/yr.

Last updated:

Install cost (national range)

$749–$2,500 (typical standard install about $1,700); a panel upgrade adds $1,500–$3,000. Source: Qmerit – How much does Level 2 EV charger installation cost? (national) (accessed 2026-10-25). Panel upgrade details for Portland.

Estimated annual charging cost

2,363 kWh × 15.92¢/kWh = $376/yr

This is a statewide average for one month (preliminary), not your utility's tariff. It excludes fixed charges and taxes. The kWh figure is a 2020 household average, not your car or mileage.

Time-of-use / EV rate

Utility and planPortland General Electric: Time of Day
Off-peak rate8.93¢/kWh (Off-peak: 9 p.m.–7 a.m. weekdays; all day weekends and holidays)
NotesIncludes energy, transmission and distribution; excludes taxes, fees and other charges.
Annual EV energy at off-peak$211/yr (2,363 kWh × 8.93¢/kWh)
Savings vs. state average priceabout $165/yr
Math: 2,363 kWh × (15.92¢ − 8.93¢) = $165. Compared with the EIA OR average, not with Portland General Electric's standard plan; fixed charges excluded.
SourcePGE – Time of Day (accessed 2026-10-25)

Compare all 50 cities

How much does it cost to charge an EV at home in Portland?

2,363 kWh × 15.92¢/kWh = $376/yr (EIA OR average residential price; 2,363 kWh/yr DOE household average).

Is there an EV time-of-use rate in Portland?

Portland General Electric: Time of Day, off-peak 8.93¢/kWh (Off-peak: 9 p.m.–7 a.m. weekdays; all day weekends and holidays).

How much does a home charger install cost?

$749–$2,500 (typical standard install about $1,700); a panel upgrade adds $1,500–$3,000 (national).

Is the federal 30C charger tax credit still available?

The federal EV charger credit (section 30C) is not allowed for any property placed in service after June 30, 2026.

Last updated: Oct 25, 2026. Methodology