Small business EV charging in Sacramento, CA

Short answer: Commercial Level 2 installation runs about $600–$12,700 per unit (average about $3,000) plus the charger, per a 2015 U.S. DOE report (national, not Sacramento-specific). SMUD: SMUD Commercial EV Program: $2,500 per low-power Level 2 handle (<6.6 kW), $3,500 per high-power Level 2 handle (≥6.6 kW); equity sites get $5,000 and $7,000. Also $1,000 per panel upgrade ($2,000 equity). Get SMUD approval before construction.

Last updated:

Information only. We don't sell or install chargers, and we have no commercial partner in Sacramento.

Commercial install cost (national)

Level 2 installation for non-residential sites: ballpark $600–$12,700 per unit (average about $3,000), not including the charger itself; Level 2 charger units cost $400–$6,500 per single port. DC fast charger installation: $4,000–$51,000.

These are national figures from a 2015 U.S. DOE report; they are old, and no city-specific commercial figure was found. DOE's current AFDC page says public and workplace Level 2 installs average around $2,500 per connector. Sources: U.S. DOE – Costs Associated With Non-Residential Electric Vehicle Supply Equipment (2015, PDF); U.S. DOE AFDC – Procurement and Installation for EV Charging Infrastructure (accessed 2026-10-25).

SMUD commercial rebates

SMUD Commercial EV Program: $2,500 per low-power Level 2 handle (<6.6 kW), $3,500 per high-power Level 2 handle (≥6.6 kW); equity sites get $5,000 and $7,000. Also $1,000 per panel upgrade ($2,000 equity). Get SMUD approval before construction.

Sources: SMUD – Business electric vehicles; SMUD – Commercial EV Program manual (accessed 2026-10-25).

Sacramento commercial permit

Commercial EV permit fee: data pending. Commercial jobs are usually priced by valuation or plan review, and we haven't sourced a Sacramento commercial line item. For reference, the residential/general fee we sourced: EVSE permit fees are based on construction valuation; the city's EVSE guide estimates $153–$358 for valuations of $1,000–$4,000. Source: City of Sacramento EVSE Permit Guide (official PDF).

How much does a commercial EV charger cost to install in Sacramento?

No Sacramento-specific figure found. Nationally, U.S. DOE (2015) puts non-residential Level 2 installation at $600–$12,700 per unit (about $3,000 average), excluding the charger.

Are there business EV charger rebates in Sacramento?

SMUD Commercial EV Program: $2,500 per low-power Level 2 handle (<6.6 kW), $3,500 per high-power Level 2 handle (≥6.6 kW); equity sites get $5,000 and $7,000. Also $1,000 per panel upgrade ($2,000 equity). Get SMUD approval before construction.

What permit does a Sacramento business need for an EV charger?

An electrical permit from the city is typical; the commercial fee is data pending on this site. Check with the Sacramento building department.