Short answer: A whole-home air-source heat pump for a 1,500–2,500 sq ft home costs about $17,000–$23,000 installed (national median $19,500, Rewiring America); we found no San Francisco-specific price, and the federal 25C heat pump tax credit ended for systems placed in service after Dec. 31, 2025.

Last updated:

How much does a heat pump cost to install?

SystemInstalled cost (national, not San Francisco-specific)
Whole-home air-source, 1,500–2,500 sq ft$17,000–$23,000 (median $19,500)
Single-zone mini-split$5,400–$8,500 (median $6,600)

Source: Whole-home air-source heat pump, 1,500–2,500 sq ft home: $17,000–$23,000 (median $19,500). Single-zone mini-split: $5,400–$8,500 (median $6,600). Ranges are 20th–80th percentile modeled national project costs (equipment plus installation). Rewiring America – Heat pumps: an overview (cost estimates) (accessed 2026-10-25). If your panel needs an upgrade, add that cost (below).

What permit fees apply in San Francisco?

Electrical permit we found (EV-specific · official schedule)Installation of EV charging station: same fee as Category 3 – $223.20 for 225A rating or less ($334.80 for 250–500A). Code page shows a 2016 edition amended 2019; confirm current amount with DBI. SF Building Code Table 1A-E (official code)

EV-specific fee from the official city/county fee schedule (accessed 2026-10-25). Surcharges and other fees may apply; confirm with the city. This is the fee for EV charger/electrical work; a heat pump also usually needs a mechanical permit, which we have not sourced (data pending).

Service/panel upgrade permitData pending

Will I need a panel upgrade?

Possibly, especially if you add a heat pump and an EV charger. National ranges:

SourcePanel upgrade cost
Qmerit (national)A panel upgrade adds $1,500–$3,000 to a Level 2 charger install.
HomeAdvisor (an Angi brand, national)Panel replacement $518–$2,194 (average $1,347); 200A upgrade $1,300–$2,000; 100A→200A $750–$2,000 excluding new circuits; permits and drywall add $150–$300. Page dated “Updated Jun 17, 2026”.

Accessed 2026-10-25. San Francisco panel upgrade details.

What rebates are available in San Francisco?

State HEEHRA/HOMES rebates (CA)Not verified on an official state page. Check your state energy office. DOE says the rebates “are now available in select states” and tells households to contact their State or Territory Energy Office; its page currently has no state-by-state status map.U.S. DOE – Home Energy Rebates Program (HOMES and HEEHR) (accessed 2026-10-25).
Utility panel rebate (EV program)PG&E: Up to 50% of equipment cost; income-qualified up to $2,000 ($5,000 if a panel upgrade is needed).PG&E Residential EV Charging Rebate (EV charger program; may not apply to a heat pump-only job)
Utility heat pump rebateData pending: we have not yet verified San Francisco utility heat pump rebates.
Federal 25C tax creditEnded. The federal Energy Efficient Home Improvement Credit (section 25C, which covered heat pumps) is not allowed for any property placed in service after December 31, 2025. IRS FS-2025-05 (accessed 2026-10-25)

How much does a heat pump cost in San Francisco?

We have no San Francisco-specific figure. Nationally, Rewiring America models $17,000–$23,000 (median $19,500) for a whole-home air-source heat pump in a 1,500–2,500 sq ft home and $5,400–$8,500 (median $6,600) for a single-zone mini-split.

Can I still get the federal heat pump tax credit?

No. The federal Energy Efficient Home Improvement Credit (section 25C, which covered heat pumps) is not allowed for any property placed in service after December 31, 2025.

Are HEEHRA/HOMES rebates available in CA?

Not verified on an official CA page. Check your state energy office; DOE says the rebates are available only in select states.

Do I need a permit for a heat pump in San Francisco?

Usually yes: heat pumps typically need mechanical and electrical permits. We have not sourced a San Francisco heat-pump permit fee; the electrical permit we found is: Installation of EV charging station: same fee as Category 3 – $223.20 for 225A rating or less ($334.80 for 250–500A). Code page shows a 2016 edition amended 2019; confirm current amount with DBI.