ChargerCostByCity

EV-ready home sheet

Short answer: Print this page (Ctrl/Cmd+P) and fill it in from the permit, panel label and charger nameplate. Why it matters: Zillow Research found listings that mention an EV charging station sold 9.5 days faster (Zillow, 2022). The sheet documents what's installed; it makes no price claim (see home value).

Last updated:

EV-Ready Home Sheet

Listings that mention an EV charging station sold 9.5 days faster (Zillow Research, 2022: zillow.com/research/eco-friendly-features/). No price premium is claimed.

Property address: ________________________________ Prepared by: ______________ Date: ________

Charger make / model
Charger level (Level 1 120 V / Level 2 240 V)
Circuit breaker size (amps)
Charger max output (amps / kW)
Hardwired or plug-in (e.g. NEMA 14-50)
Electrical panel rating (amps)
Panel make / age
Permit number and final inspection date
Installer (licensed electrician) and license #
Install date / warranty end
Utility and EV or time-of-use rate plan
Rebate received (program, amount)
Parking location / cable reach
Solar or battery on site
Notes

Verify the permit with the city and the panel rating on the panel label. Template from chargercostbycity.com/ev-ready-home-sheet/ (rev. Oct 25, 2026). No figures are pre-filled.

Last updated: Oct 25, 2026.

What should an EV-ready listing document?

The charger level and model, breaker size, panel rating, permit and inspection, installer, and the utility rate plan.

Does a charger add value to a listing?

Zillow found listings mentioning an EV charging station sold 9.5 days faster; no significant price premium was reported.