Short answer: A driver's home Level 2 install costs $749–$2,500 (Qmerit, national, not city-specific), and OR residential power averages 15.92¢/kWh (EIA, August 2026). Monthly reimbursement = miles × kWh/mile × $0.1592.

Last updated:

What does the home charger install cost?

Installed range (national)$749–$2,500
Portland permitBranch circuits (without service/feeder fee): first circuit $174, each additional $21. Service 200A $212. Plus 12% Oregon state surcharge.

Sources: Qmerit – How much does Level 2 EV charger installation cost? (national, accessed 2026-10-25); Portland electrical permit fee schedule, eff. July 10, 2026 (official) (accessed 2026-10-25).

How much should we reimburse each month?

Enter miles and the vehicle's kWh per mile (from its window sticker or fleet data).

OR residential rate15.92¢/kWh
Formulamiles × kWh/mile × 15.92 ÷ 100

Source: EIA Electric Power Monthly, Table 5.6.A (residential, August 2026, preliminary; released Oct 23, 2026) (accessed 2026-10-25). This is a state average. A driver's actual utility tariff may differ.

Is the install cost specific to Portland?

No. It is Qmerit's national range. The permit line is city-specific where sourced.

Why use the state average rate?

It is the most local residential rate we can source for every city (EIA Table 5.6.A). For exact figures, use the driver's own utility bill.