Fleet take-home EV charging by city
Short answer: A driver's home Level 2 install runs $749–$2,500 (Qmerit, national). Monthly reimbursement = miles × kWh per mile × the state's residential rate (EIA, August 2026). Pick a city to calculate it and print a one-page summary.
Last updated:
Which city?
| City | State residential rate (¢/kWh) |
|---|---|
| Los Angeles, CA | 29.75 |
| San Jose, CA | 29.75 |
| San Diego, CA | 29.75 |
| Seattle, WA | 14.63 |
| Portland, OR | 15.92 |
| Denver, CO | 17.17 |
| Phoenix, AZ | 15.05 |
| Austin, TX | 15.91 |
| Atlanta, GA | 15.9 |
| Chicago, IL | 19.32 |
| San Francisco, CA | 29.75 |
| Oakland, CA | 29.75 |
| Fresno, CA | 29.75 |
| Sacramento, CA | 29.75 |
| Irvine, CA | 29.75 |
| Long Beach, CA | 29.75 |
| Anaheim, CA | 29.75 |
| Memphis, TN | 13.42 |
| New York City, NY | 28.65 |
| Newark, NJ | 24.61 |
| Boston, MA | 30.48 |
| Washington, DC | 25.98 |
| Arlington, VA | 17.64 |
| Richmond, VA | 17.64 |
| Virginia Beach, VA | 17.64 |
| Baltimore, MD | 21.4 |
| Philadelphia, PA | 21.77 |
| Pittsburgh, PA | 21.77 |
| Las Vegas, NV | 12.72 |
| Salt Lake City, UT | 13.31 |
| Tucson, AZ | 15.05 |
| Dallas, TX | 15.91 |
| Fort Worth, TX | 15.91 |
| Houston, TX | 15.91 |
| San Antonio, TX | 15.91 |
| Miami, FL | 14.99 |
| Fort Lauderdale, FL | 14.99 |
| Tampa, FL | 14.99 |
| Orlando, FL | 14.99 |
| Jacksonville, FL | 14.99 |
| Minneapolis, MN | 17.2 |
| Detroit, MI | 22.99 |
| Columbus, OH | 19.38 |
| Indianapolis, IN | 17.02 |
| Kansas City, MO | 16.02 |
| St. Louis, MO | 16.02 |
| Oklahoma City, OK | 14.82 |
| Charlotte, NC | 14.95 |
| Raleigh, NC | 14.95 |
| Nashville, TN | 13.42 |
Rates: EIA Electric Power Monthly, Table 5.6.A (residential, August 2026, preliminary; released Oct 23, 2026). These are state averages, not city or utility tariffs.
How is reimbursement calculated?
Monthly miles × your vehicle's kWh per mile × the state average residential cents per kWh ÷ 100.
Is the install cost city-specific?
No. It is Qmerit's national range.