Short answer: A single Level 2 install costs $749–$2,500 nationally (Qmerit), or $449–$2,200 after the verified local rebate. Portland permit: Branch circuits (without service/feeder fee): first circuit $174, each additional $21. Service 200A $212. Plus 12% Oregon state surcharge. Law: Oregon has a right-to-charge law covering renters and condo/HOA owners. Rent: no measured premium found; in one 2022 survey renters said they would be willing to pay $28.12/month more (stated willingness, not achieved rent).

Last updated:

Install cost per space

Level 2 install (national)$749–$2,500 (typical standard install about $1,700); a panel upgrade adds $1,500–$3,000 Source: Qmerit – How much does Level 2 EV charger installation cost? (national) (accessed 2026-10-25).
Portland permitBranch circuits (without service/feeder fee): first circuit $174, each additional $21. Service 200A $212. Plus 12% Oregon state surcharge (General electrical permit · official schedule) General electrical permit fee from the official city/county fee schedule (accessed 2026-10-25); the schedule has no EV-charger line. Your actual permit may cost more or less. Source: Portland electrical permit fee schedule, eff. July 10, 2026 (official) (accessed 2026-10-25).
Net of verified rebate$449–$2,200
Math: $749 − $300 = $449; $2,500 − $300 = $2,200 Source: PGE – Charging your EV at home (accessed Oct 24–25, 2026).

These are single-family style installs. Multi-unit garages often need load management, trenching or service upgrades; site-specific cost data for Portland is pending.

Oregon right-to-charge rules

Condo / HOA owners (Oregon)ORS 100.627 (condominiums) and ORS 94.762 (planned communities) limit how associations can prohibit or restrict a charger in an owner's designated or exclusive-use space. [read on official page] Sources: ORS Chapter 100 – Oregon State Legislature; ORS Chapter 94 – Oregon State Legislature (accessed 2026-10-25).
Renters (Oregon)ORS 90.462: a tenant may apply to install a charger in or near an assigned space; the landlord may prohibit it only if the premises lack at least one parking space per unit, and must approve a complete, compliant application within 60 days. Source: ORS Chapter 90 – Oregon State Legislature (accessed 2026-10-25).

Summaries, not legal advice. Read the statute before relying on it.

Does a charger raise rent? (survey of stated willingness only)

Stated willingness to pay, not a measured rent premium: the 2022 NMHC/Grace Hill Renter Preferences Report found 27% of renters were interested in EV charging stations and respondents said they would pay an additional $28.12 per month for the amenity.

This is a survey answer from the 2022 report (paywalled; figures quoted by trade press). It is national, not city-specific, and is not evidence that a given unit will rent for $28.12 more. We found no peer-reviewed study measuring achieved rent premiums for EV charging. Sources: Multi-Housing News – EV Charging Basics for Multifamily Owners (Sept 2, 2022), quoting the 2022 NMHC/Grace Hill Renter Preferences Report; Utility Dive – Demand soars for EV charging at multifamily properties (Dec 15, 2022) (accessed 2026-10-25).

No measured rent data for Portland: data pending.

Portland charging cost · Total cost to drive electric in Portland · Condo and HOA rules

Last updated: Oct 25, 2026.

Can my landlord in Portland refuse an EV charger?

ORS 90.462: a tenant may apply to install a charger in or near an assigned space; the landlord may prohibit it only if the premises lack at least one parking space per unit, and must approve a complete, compliant application within 60 days.

Can a Portland condo association ban chargers?

ORS 100.627 (condominiums) and ORS 94.762 (planned communities) limit how associations can prohibit or restrict a charger in an owner's designated or exclusive-use space.

Do EV chargers raise rents?

No measured rent premium found. The 2022 NMHC/Grace Hill survey reports renters say they'd pay $28.12 more per month; that's stated willingness, not achieved rent.

How much does a Level 2 install cost in Portland?

$749–$2,500 nationally (Qmerit); permit: Branch circuits (without service/feeder fee): first circuit $174, each additional $21. Service 200A $212. Plus 12% Oregon state surcharge.