Electrical code (NEC) edition by state, for EV charger installs

Short answer: 36 of 50 states have an edition we could verify from NFPA's adoption table or a state agency; 14 are marked unverified. 8 verified states are on the 2026 NEC (Colorado, Maine, Massachusetts, Minnesota, North Dakota, Oregon, Texas, Wyoming) and 15 on the 2023 NEC. The 2023 NEC requires an individual branch circuit for chargers over 16 A or 120 V and GFCI on charger receptacles, and it lets an energy management system cap the charger load used for service and feeder sizing.

Last updated:

What does each NEC edition mean for an EV charger circuit?

RuleWhat it saysSource
625.40 Individual branch circuitCharging equipment rated over 16 A or 120 V must be on an individual branch circuit (one that supplies only that equipment). Exception: one branch circuit may supply more than one charger when an energy management system manages the load under 625.42(A) or (B).2023 NEC text as restated by Mike Holt; code: NFPA 70
625.41 / 625.42 Continuous loadOvercurrent protection must be at least 125% of the charger's current rating; EV charging is treated as a continuous load. Holt's worked example: a 40 A charger needs conductors rated at least 50 A.Mike Holt (2023 NEC)
625.42(A) Energy management (2023)Where an energy management system controls the charger, the charger load is not included when sizing feeders and service conductors, per 750.30(C)(1)(1). This is how load management can avoid a service upgrade.Mike Holt (2023 NEC)
625.42(B) Adjustable settings (2023)If a charger has an adjustable amp setting, the setting must appear on its rating label, durable enough for the environment.Mike Holt (2023 NEC)
625.54 GFCIReceptacles installed to connect charging equipment must have GFCI protection. A hardwired charger is not on a receptacle.Mike Holt (2023 NEC)
2026 edition, 625.54A proposal to add special-purpose GFCI protection for hardwired chargers was appealed. NFPA's Standards Council upheld the appeal, so the expansion did not go into the 2026 NEC.NFPA D#25-2

We could not open the NEC text itself: NFPA's free read-only access requires creating an account, which we did not do. The 2023 rules above come from Mike Holt's published restatement of the 2023 Article 625 text. We didn't find an equally detailed public source for 2017 or 2020 wording, so we don't claim edition-by-edition differences beyond the 2023 load-management rules and the 2026 GFCI decision. Your local inspector has the final say and may enforce local amendments.

Which NEC edition does each state enforce?

"Verified" means the edition comes from NFPA's state-by-state table (as of Aug 3, 2026) or from a state agency page we opened on Oct 25, 2026. "Unverified" means either there's no statewide edition, or NFPA showed an update underway with no effective date and we didn't check a state source.

StateEditionStatusNFPA entry (Aug 3, 2026)Notes and source
Alabama2020 NECVerified (NFPA)2020 (7/1/2022), Alabama Division of Construction Management [NFPA]
Alaska2020 NECVerified (NFPA)2020 (4/16/2020) [NFPA]
ArizonaNo statewide editionUnverifiedLocal adoption onlyNo statewide edition; each city or county adopts its own. We did not verify local editions. [NFPA]
Arkansas2020 NECUnverified2020 with AR amendments (8/1/2022)NFPA listed this edition on Aug 3, 2026, but an update was underway (2026 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
California2023 NECVerified (NFPA)2023 with CA amendments (1/1/2026) [NFPA]
Colorado2026 NECVerified (NFPA)2026 (8/1/2026) [NFPA]
Connecticut2020 NECUnverified2020 with CT amendments (10/1/2022)NFPA listed this edition on Aug 3, 2026, but an update was underway (2023 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Delaware2023 NECVerified (NFPA)2023 (1/1/2026) [NFPA]
Florida2020 NECUnverified2020 (12/31/2023)NFPA listed this edition on Aug 3, 2026, but an update was underway (2023 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Georgia2023 NECVerified (NFPA)2023 (1/1/2025) [NFPA]
Hawaii2020 NECVerified (NFPA)2020 (3/14/2023) [NFPA]
Idaho2023 NECVerified (NFPA)2023 (7/1/2023) with ID amendments (temporary rules permit use of 2017 NEC w/ID amendments) [NFPA]
Illinois2008 NECVerified (NFPA)2008 (7/1/11, commercial occupancies outside local jurisdictions that have adoption authority) [NFPA]
Indiana2008 / 2017 NECUnverified2008 commercial with IN amendments (8/26/2009); 2017 (2018 IRC) one- and two-family dwellings with IN amendments (12/26/2019)NFPA listed this edition on Aug 3, 2026, but an update was underway (2023 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Iowa2023 NECUnverified2023 with IA amendments (7/1/2025)NFPA listed this edition on Aug 3, 2026, but an update was underway (2026 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Kansas2008 NECVerified (NFPA)2008 (2/4/11, State Fire Marshal) [NFPA]
Kentucky2023 NECUnverified2023 (1/1/2025)NFPA listed this edition on Aug 3, 2026, but an update was underway (2026 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Louisiana2020 NECVerified (NFPA)2020 (1/1/2023) [NFPA]
Maine2026 NECVerified (NFPA)2026 with ME amendments (7/1/2026) [NFPA]
Maryland2020 NECUnverified2020 (7/1/2025) with MD amendmentsNFPA listed this edition on Aug 3, 2026, but an update was underway (2023 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Massachusetts2026 NECVerified (NFPA)2026 with MA amendments (4/24/2026) [NFPA]
Michigan2023 / 2014 NECUnverified2023 commercial (3/12/2024); 2014 one- and two-family dwellings (2/8/2016)NFPA listed this edition on Aug 3, 2026, but an update was underway (2026 update process underway (commercial effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Minnesota2026 NECVerified (NFPA)2026 (8/17/2026) [NFPA]
MississippiNo statewide editionUnverifiedLocal incorporation by reference onlyNo statewide edition; each city or county adopts its own. We did not verify local editions. [NFPA]
MissouriNo statewide editionUnverifiedLocal incorporation by reference onlyNo statewide edition; each city or county adopts its own. We did not verify local editions. [NFPA]
Montana2023 NECVerified (state source)2020 with MT amendments (6/10/2022)Montana DLI lists the National Electrical Code, 2023 edition, effective Sept 26, 2026. [state]
Nebraska2023 NECUnverified2023 (8/1/2024)NFPA listed this edition on Aug 3, 2026, but an update was underway (2026 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Nevada2017 NECVerified (NFPA)2017 (7/1/18, Nevada State Public Works Division) [NFPA]
New Hampshire2023 NECVerified (NFPA)2023 with NH amendments (7/1/2025, 6-month grace period for the prior edition) [NFPA]
New Jersey2023 NECVerified (state source)2020 with NJ amendments (9/6/2022)Electrical subcode N.J.A.C. 5:23-3.16 adopts the 2023 NEC effective Aug 17, 2026 (NFPA's Aug 3 table still showed 2020). Applications may use the 2020 NEC through Feb 17, 2027. [state]
New Mexico2020 NECVerified (NFPA)2020 (3/28/2023) [NFPA]
New York2023 NECVerified (NFPA)2023 (12/31/2025) [NFPA]
North Carolina2020 NECVerified (NFPA)2020 with NC amendments for other than one- and two-family dwellings (11/1/21) [NFPA]
North Dakota2026 NECVerified (NFPA)2026 (7/1/2026) [NFPA]
Ohio2023 NECVerified (NFPA)2023 commercial (3/1/2024); residential with OH amendments (4/15/2024) [NFPA]
Oklahoma2023 NECVerified (NFPA)2023 (9/14/2024) [NFPA]
Oregon2026 NECVerified (state source)2023 with OR amendments (10/1/2023)2026 Oregon Electrical Specialty Code, based on the 2026 NEC, effective Oct 1, 2026. [state]
Pennsylvania2020 NECVerified (NFPA)2020 (1/1/2026) [NFPA]
Rhode Island2023 NECVerified (NFPA)2023 (12/1/2025) [NFPA]
South Carolina2020 NECVerified (NFPA)2020 with SC amendments (1/1/2023)NFPA: 2023 update complete (effective 1/1/2027). [NFPA]
South Dakota2023 NECVerified (NFPA)2023 (11/12/2024) with SD amendments [NFPA]
Tennessee2017 NECVerified (NFPA)2017 (10/1/2018) with TN amendments [NFPA]
Texas2026 NECVerified (state source)2023 (9/1/2023)TDLR adopted the 2026 NEC (16 TAC §73.100), effective Sept 1, 2026, with a GFCI exception for listed outdoor HVAC equipment. [state]
Utah2023 NECVerified (NFPA)2023 (1/1/2025) [NFPA]
Vermont2020 NECUnverified2020 (1/1/2023)NFPA listed this edition on Aug 3, 2026, but an update was underway (2023 update process underway). We did not check a state source, so the current edition is unverified. [NFPA]
Virginia2020 NECUnverified2020 (1/18/2024)NFPA listed this edition on Aug 3, 2026, but an update was underway (2023 update process underway (effective date not established)). We did not check a state source, so the current edition is unverified. [NFPA]
Washington2023 NECVerified (NFPA)2023 (4/1/2024)NFPA: 2026 update process underway (projected 12/31/2026). [NFPA]
West Virginia2020 NECVerified (NFPA)2020 with WV amendments (8/1/2022) [NFPA]
Wisconsin2023 NECVerified (NFPA)2017 commercial (8/1/2018), residential (1/1/2020)NFPA lists the 2023 update as complete, effective 9/1/2026. [NFPA]
Wyoming2026 NECVerified (NFPA)2026 (7/1/2026) [NFPA]

NFPA also lists city editions: Chicago enforces the 2017 NEC with Chicago amendments (3/1/2018), and New York City the 2020 NEC with NYC amendments (12/21/2025). Both differ from their states.

Related: what inspectors check · build an electrician bid request · permit fee index

Sources

  1. NFPA – Learn where the NEC is enforced (state-by-state table, as of Aug 3, 2026; accessed 2026-10-25)
  2. Montana DLI Building Codes – Current Codes (accessed 2026-10-25)
  3. NJ DCA – Current Construction Codes (accessed 2026-10-25)
  4. Oregon Building Codes Division – OESC adoption (accessed 2026-10-25)
  5. TDLR – Commission Adopts Rules (Electricians, posted Sept 1, 2026) (accessed 2026-10-25)
  6. Mike Holt, "Electric Vehicle Power Transfer System" – Article 625 text, 2023 NEC (PDF) (accessed 2026-10-25)
  7. NFPA 70, National Electrical Code (2023) – NFPA product page
  8. NFPA Standards Council decision D#25-2 on NFPA 70 (2026 edition), Sept 4, 2025 (PDF)

Does my state's NEC edition change what I pay?

Not directly, and we have no sourced cost difference between editions. What the edition changes is the rules: for example, under the 2023 NEC an energy management system can keep the charger out of the service-size calculation.

Do I need GFCI for a plug-in charger?

Yes. NEC 625.54 requires GFCI protection for receptacles installed to connect EV charging equipment. A 2026 proposal to extend special-purpose GFCI protection to hardwired chargers was rejected on appeal (NFPA D#25-2).

Can two chargers share one circuit?

Under the 2023 NEC 625.40 exception, yes, but only when an energy management system manages the load under 625.42. Otherwise each charger over 16 A or 120 V needs its own branch circuit.

Why is my state unverified?

Either the state has no statewide edition, so cities and counties adopt their own (Arizona, Mississippi, Missouri), or NFPA showed an update underway with no effective date and we didn't confirm the result with a state source.