Short answer: An 8-point visual checklist for noting a home's EV charging readiness, plus a one-page insert (print this page) that sends buyers to permit fees, rebates and install cost ranges for their city. It records what is visible; it is not an electrical evaluation, and load calculations belong to a licensed electrician.

Last updated:

Checklist

#ItemWhat to noteReference
1Existing chargerMake/model, Level 1 (120 V) or Level 2 (240 V), hardwired or plug-in (e.g. NEMA 14-50). Note visible damage to cable, connector or housing.—
2Dedicated circuitBreaker size feeding the charger and whether it is labeled at the panel. Compare breaker and charger rating with the NEC 625.41 continuous-load rule explained on the charger size page./charger-size/
3PanelPanel rating from the label, make, visible free breaker spaces, and any visible defects. Whether a panel upgrade may be needed is an electrician's load calculation./panel-upgrade-checker/
4Receptacle / GFCIFor plug-in units, receptacle type and condition; note whether GFCI protection is present. Which NEC edition applies depends on the state./electrical-code-by-state/
5Permit recordAsk the seller for the permit number and final inspection. Note "not provided" if none./what-inspectors-check-ev-charger/
6Parking and routeGarage, carport or driveway; approximate distance from panel to likely charger spot (longer runs usually cost more).—
7UtilityUtility name, so the buyer can check EV rate plans and rebates./rebates/
8Solar / batterySolar or battery on site (affects panel capacity and rate plans).—

NEC adoption by state: NFPA NEC enforcement maps. Charger sizing rule (NEC 625.41): charger size by breaker.

Code figures to compare against (2023 NEC)

Source: Mike Holt Enterprises, "Understanding 2023 NEC Requirements for Solar PV and Energy Storage Systems," Article 625 excerpt (accessed Oct 25, 2026). Your state may enforce an earlier edition; check the NFPA enforcement map.

Print the insert below with Ctrl/Cmd+P. Only the insert prints.

EV charging readiness (report insert)

Property: ______________________________ Inspector: __________________ Date: __________

Existing charger
Dedicated circuit
Panel
Receptacle / GFCI
Permit record
Parking and route
Utility
Solar / battery

Visual observations only, not an electrical load calculation or code compliance review. Get a licensed electrician's quote before buying a charger.

Install cost, permit fee and rebates for your city: chargercostbycity.com/city/<your-city>/

Template: chargercostbycity.com/home-inspector-ev-kit/ (rev. Oct 25, 2026). Free to use; no cost figures pre-filled.

Should a home inspector evaluate an EV charger?

An inspector can note what is visible (charger type, breaker, panel label, permit paperwork). Sizing and load calculations are for a licensed electrician.

Where can buyers see install costs?

Each city page on chargercostbycity.com lists the sourced permit fee, verified utility rebates and the national Qmerit cost range.

Last updated: Oct 25, 2026.